As NASA prepares for the first integrated flight test of the Space Launch System (SLS) rocket and the Orion spacecraft to the Moon this summer as part of Artemis, the agency is moving toward a services contract model for long-term SLS hardware production and operations to reduce costs.
Related posts
-
Space Force to march in Trump’s Jan. 20 inauguration, a 1st for the new military branch
On Monday (Jan. 20), the U.S. Space Force will participate in a presidential inauguration for the... -
Hydrogen Sulfide (H2S) Independent Assessment
3 min read Preparations for Next Moonwalk Simulations Underway (and Underwater) AS16-116-18653 (23 April 1972) —... -
NASA Scientists, Engineers Receive Presidential Early Career Awards
This image from NASA’s James Webb Space Telescope shows the dwarf galaxy NGC 4449. ESA/Webb, NASA...